Question: 1
Refer to the exhibit.
A junior network engineer has prepared the exhibited configuration file. What two statements are true of the planned configuration for interface fa0/1? (Choose two.)
A. The two FastEthernet interfaces will require NAT configured on two outside serial interfaces.
B. Address translation on fa0/1 is not required for DMZ Devices to access the Internet. C. The fa0/1 IP address overlaps with the space used by s0/0.
D. The fa0/1 IP address is invalid for the IP subnet on which it resides.
E. Internet hosts may not initiate connections to DMZ Devices through the configuration that is shown.
Answer: B, E Question: 2
Refer to the exhibit.
TK
Exam Name: Interconnecting Cisco Networking Devices Part 2
Exam Type: Cisco Case Studies: 2
Exam Code: 640-816 Total Questions: 136
Which statement describes DLCI 17?
A. DLCI 17 describes the ISDN circuit between R2 and R3.
B. DLCI 17 describes a PVC on R2. It cannot be used on R3 or R1.
C. DLCI 17 is the Layer 2 address used by R2 to describe a PVC to R3.
D. DLCI 17 describes the dial-up circuit from R2 and R3 to the service provider.
Answer: C Question: 3
What is the default Local Management Interface frame type transmitted by a Cisco router on a
Frame Relay circuit?
A. Q933a B. B8ZS C. IETF D. Cisco E. ANSI
Answer: D Question: 4
Refer to the exhibit.
The network shown in the exhibit has just been installed.
Host B can access the Internet, but it is unable to ping host C. What is the problem with this configuration?
TK
Exam Name: Interconnecting Cisco Networking Devices Part 2
Exam Type: Cisco Case Studies: 2
Exam Code: 640-816 Total Questions: 136
A. Host B should be in VLAN 13.
B. The address of host C is incorrect.
C. The gateway for host B is in a different subnet than the host is on.
D. The switch port that sends VLAN 13 frames from the switch to the router is shut down.
E. The switch port connected to the router is incorrectly configured as an access port.
Answer: B Question: 5
Routing has been configured on the local router with these commands:
Local(config)# ip route 0.0.0.0 0.0.0.0 192.168.1.1
Local(config)# ip route 10.1.0.0 255.255.255.0 192.168.2.2
Local(config)# ip route 10.1.0.0 255.255.0.0 192.168.3.3
Drag each destination IP address on the left to its correct next hop address on the right.
Answer:
Question: 6
Refer to the exhibit.
TK
Exam Name: Interconnecting Cisco Networking Devices Part 2
Exam Type: Cisco Case Studies: 2
Exam Code: 640-816 Total Questions: 136
The router has been configured with these commands:
hostname Gateway interface FastEthernet 0/0
ip address 198.133.219.14 255.255.255.248
no shutdown
interface FastEthernet 0/1
ip address 192.168.10.254 255.255.255.0
no shutdown interface Serial 0/0
ip address 64.100.0.2 255.255.255.252
no shutdown
ip route 0.0.0.0 0.0.0.0 64.100.0.1
What are the two results of this configuration? (Choose two.)
A. The default route should have a next hop address of 64.100.0.3.
B. Hosts on the LAN that is connected to FastEthernet 0/1 are using public IP addressing.
C. The address of the subnet segment with the WWW server will support seven more servers. D. The addressing scheme allows users on the Internet to access the WWW server.
E. Hosts on the LAN that is connected to FastEthernet 0/1 will not be able to access the Internet without address translation.
Answer: D, E Question: 7
Refer to the exhibit.
Exam 640-816: Interconnecting Cisco Networking Devices Part 2 (ICND2)
Number of questions: 45-55
Duration: 75 minutes
Cost: $125, Available at Pearson VUE Testing Centers
Exam Topics Include:
1. Configure, verify and troubleshoot a switch with VLANs; including interswitch communications
2. Implement an IP addressing scheme and IP services to meet network requirements in a small to medium-size Enterprise branch office network, including VLSM
3. Configure and troubleshoot basic operation and routing on Cisco devices using IOS.
4. Implement, verify, and troubleshoot NAT and ACLs in a medium-size Enterprise branch office network.
5. Implement and verify WAN links, including PPP and Frame Relay.
The 640-816 Interconnecting Cisco Networking Devices Part 2 (ICND2) exam is the second part of the two-exam track for earning the CCNA certification. Passing the two ICND exams can be used as an alternative to the single CCNA exam, 640-802, in obtaining the Cisco Certified Network Associate certification. The 640-816 exam tests a candidate’s knowledge and skills required to successfully install, operate, and troubleshoot a small to medium size enterprise branch network. The exam covers topics on VLSM and IPv6 addressing; extending switched networks using VLANs; routing protocols; determining IP routes; managing IP traffic with access lists; NAT and DHCP; establishing point-to- point connections; and establishing Frame Relay connections.
Interactive Testing Engine Included!
469 Questions
Updated : 08/21/2008
Price : $76.99 $69.99
Free download?Testking ccna 640-816
Free download?pass4sure ccna 640-816
| Cisco Braindumps Free Downloads |
|
Type |
Exam Bible | New Questions & Answers |
Latest Updated |
Download link |
![]() |
All Cisco 's Exam Pack |
589 |
1 days ago | Download |


[...] download: testking 640-816 Free download: pass4sure 640-816 Free download: actualtest 640-816 Free download: testinside [...]